500GPM Mud System for Water Well Drilling
500GPM mud system is a top configuration for water well drilling for 500 meters drill hole. It contains first phase treatment shale shaker, second phase desander cone and third phase desilter cone installed on shaker for second equipment, 2 sets of centrifugal pumps, 1 set mud agitator, 1 set mixing hopper and 1 set of mud tank. The tank size can be customized from 6 meters to 12 meters depending on tank capacity requirement. High Configuration 500GPM Mud System Specification…