Flare Ignition Device Delivery To Jobsite
AIPU Solids Control deliveried 7 sets of flare ignition device to jobsite this week. The client ordered 7 sets of flare ignition device for 7 sets of oil drilling rig and solids control system on jobsite. The ignition device will be connected with poor boy degasser to ignition the waste gas out of drilling mud that separated by poor boy degasser. There will need around 60 meters pipe from poor boy degasser to flare ignition device for jobsite safety purpose….