Browsed by
Category: mud system

500GPM Mud System for Water Well Drilling ?>

500GPM Mud System for Water Well Drilling

500GPM mud system is a top configuration for water well drilling for 500 meters drill hole. It contains first phase treatment shale shaker, second phase desander cone and third phase desilter cone installed on shaker for second equipment, 2 sets of centrifugal pumps, 1 set mud agitator, 1 set mixing hopper and 1 set of mud tank. The tank size can be customized from 6 meters to 12 meters depending on tank capacity requirement. High Configuration 500GPM Mud System Specification…

Read More Read More

Share
Container Frame Mud System Delivery to Australia ?>

Container Frame Mud System Delivery to Australia

Container Frame mud system is very popular in Australia because of fast moving for inland delivery. AIPU Solids Control built 2 sets of container frame mud system for an Australia client for horizontal directional drilling (HDD) rig. The shale shaker and mud mixer installed on tank top with a container frame for loading tank. All equipment will stay on top of tank without disassemble when inland transport. The pumps lay on tank skid bellow tank bottom for fixed installation without…

Read More Read More

Share