Browsed by
Tag: Mud tank

Mud Mixing Tank For HDD Drilling ?>

Mud Mixing Tank For HDD Drilling

Mud Mixing tank can be a separate mud tank or combination with mud recycling tank. HDD drilling, full name is horizontal directional drilling. HDD drilling will require mud mixing tank with mixing pump and hopper. The size and specification required will be depending on different drill rig and drilling condition. AIPU mud mixing tank can be different design on mud tank size, pipe line arrangement, mud agitator size options, tank top material with checker plate or gratings, mixing pump size,…

Read More Read More

Centrifugal Pump & Mud Gun Delivery ?>

Centrifugal Pump & Mud Gun Delivery

AIPU Solids Control build a complete line of solids control equipment as well as mud tank attachement. Centrifugal pump and mud gun will be used to sit or install on mud tank depending on tank application. The centrifugal pump mainly for mud transfer and supply a suitable pressure if feeding into cyclone or mud pump. Mud gun will work for mud transfer and mud agitating as well. AIPU just deliveried many sets of centrifugal pump and mud gun for a…

Read More Read More

Tank Valve Delivery To Indonesia ?>

Tank Valve Delivery To Indonesia

AIPU Solids Control finished a tank valve order and delivery to Indonesia end of this week for a tank manufacturer. There are many mud tank manufacturers that build tank need solids control accessory or related spare parts. The tank valve is design and install on the mud tank for tank compartment control and mud transfer pipeline requirement. This client ordered some other equipments for a whole solids control system like centrifugal pump, mud agitator, mud gun, tank valves and shaker…

Read More Read More

Mud Tank Design For Oilfield Solids Control ?>

Mud Tank Design For Oilfield Solids Control

Mud tank for solids control system is design for mud holding while treatment by solids control equipment and mud storage after mud mixing or separating. The mud tank can be different size depending on drilling requirement by different length, width and height. The tank can be skid mounted tank or jack up tank or trailer mounted tank depending on client requirement. The standard tank wall thickness is 8mm, the thickness can be customized depending on client requirement. The tank bottom…

Read More Read More

Mud Cleaning Unit For Pilling Rig ?>

Mud Cleaning Unit For Pilling Rig

Pilling mud cleaning unit normally required high mud flow, large quantity solids particals and compact design for small foot print and cost effective options . AIPU Solids Control build a pilling mud cleaning unit to suit all piling requirement. Normally double deck shale shaker is a good options for 2 phase cleaning with scalping screen and desander cyclones . Double Deck Shale Shaker In Mud Cleaning Unit Depending on mud flow requirement, clients choose different model of double deck shale…

Read More Read More